Technical audit
Skyfri: a seven-week audit, then the EMS
Skyfri in Oslo asked for a technical audit to show what to change in the process of building the product. It ran from 20 November 2023 to 7 January 2024, and the talks in Oslo produced a new project. Since January 2024 our engineers have worked inside the Skyfri team. The EMS has run in production since June 2024 and controls the batteries across 7 plants, more than 5 MWh in total, with more than 4 MW of battery power.